Satudy of the Geotextile Effect as a Filter and Drain in Earth Dams

New Satudy of the Geotextile Effect as a Filter and Drain in Earth Dams

Filters and drains consist 5 to 10 percent of the total volume of soil operations.  Replacing Geotextile drainage with filter and granular drainage improves efficiency and reduces cost.  It was first used in 1970 at the Valcros dam of France with a height of 17 meters from the non-woven geotextile around the downstream sandy drainage and also under the Riprap the upstream surface protector was used.


Model Capabilities
Drain and filter modeling in soil
 

Drain and filter modeling in soil


Dam's seepage check
 

Dam's seepage check


Critical confidence coefficient examination
 

Critical confidence coefficient examination


Inspecting the dam's settlement
 

Inspecting the dam's settlement


Investigating pore water pressure

 

Investigating pore water pressure

 

What you will learn in this model
• Introduction to Earth Dams
• Introduction to the filter and its role in controlling seepage
• Introduction to geotextile as filter and drain
• Understanding how to model dams in Geostudio software


Tips and Requirements
• Understanding the Finite-Element Method
• Understanding Soil Mechanics
• Understanding the earth dams
• Understanding the filtration and drainage in earth dams


Site's Objectives in Presenting this Project
This project studies the geotextile effect as a filter and drain in earth dams.This project could be helpful for university students, researchers and etc. Also it could be proved useful in scientific and industrial projects, and MSc and PhD theses. In some cases, university students require investigation and research for their MSc and PhD theses. Since the present project consists of a complete project and includes all university flowcharts, it could prove useful.

Write a review

Note: HTML is not translated!
    Bad           Good
Captcha
  • Views: 339
  • Brand: civilhelper
  • Product Code: CV1-1143
  • Availability: In Stock
  • $0.00
  • Ex Tax: $0.00

Tags: Geotextile, Filter, Drain, Earth, Dam