Optimization of Concrete Gravity Dam's Dimensional Design Using Metaheuristic Algorithms
Introduction
The construction purpose of the dam:
• Flood control
• Supplying water
• Power generation (hydroelectric)
• Recreational
Limitations:
• Failure to meet all needs during the operation period
• Need for large funds
• The complexity of reservoir design issues in case of considering real conditions
The most important objective functions:
• Minimizing reservoir capacity
• Maximizing net profit from exploitation
Reservoirs' Operation:
• Supply of downstream water (simple operation)
• Supply of energy (hydroelectric operation)
Cellular automata algorithms and Ant Colony
Algorithms of cellular automata and Ant Colony
Founding
Durigo et al. (1961)
As a multi-factor solution for problematic optimization issues such as travelling salesman
Based on the behavior of the ants to find food, especially how to find the shortest route between food and nest
Optimum reservoir design
Finding the minimum reservoir size that:
• Provides the operating qualification
• Provides the objective reliability
Presented Algorithms:
First Algorithm: ARCA
Second algorithm: Ant-CA
Site's Objectives in Presenting this Project
This project studies the optimization of the Concrete Gravity Dam's Dimensional Design Using Metaheuristic Algorithms. This project could be helpful for university students, researchers and etc. Also it could be proved useful in scientific and industrial projects, and MSc and PhD theses. In some cases, university students require investigation and research for their MSc and PhD theses. Since the present project consists of a complete project and includes all university flowcharts, it could prove useful.