Seismic Evaluation of Bridges Using SAP2000 Software

New Seismic Evaluation of Bridges Using SAP2000 Software

Vulnerability assessment is a very useful method for identifying the weaknesses of bridges that have long been constructed which their resistance against contingent earthquakes is measured. Using seismic vulnerability assessment, the need or lack of need of bridges for optimization is determined. 

Several methods, such as linear static method, nonlinear static method, linear dynamic method and nonlinear dynamic method, can be used to perform the analysis to evaluate seismic vulnerability.

The SAP2000 is a very powerful software for dynamic and static analysis and linear and nonlinear analysis. Thus, seismic evaluation using this software can provide precise and useful results.

 

The Plan's Capabilities

Introduction to the principles and concepts of seismic evaluation of structures
Introduction to the principles and concepts of seismic evaluation of structures
Introduction to Bridge Modeling in SAP2000 Software

 

Introduction to Bridge Modeling in SAP2000 Software 


Understanding Types of Linear and Nonlinear Analysis    
 

Understanding Types of Linear and Nonlinear Analysis


Understanding the Process of Performing Linear and Nonlinear Analysis in SAP2000 Software
 

 Linear and Nonlinear Analysis in SAP2000 Software

 

 Linear and Nonlinear Analysis in SAP2000 Software


Understanding the method of seismic evaluation of concrete bridges 
 

method of seismic evaluation of concrete bridges


What you will learn in this documentary

• Familiarity with the concepts of seismic assessment and its methods
• How to model concrete bridges in SAP2000 software
• The configuration method for multi-mode spectral analysis on concrete bridges in SAP200 software
• The configuration method for pushover analysis on concrete bridges in SAP2000 software
• How to draw tables and output charts from both multi-mode spectral analysis and pushover analysis in SAP2000
• How to analyze software outputs and perform seismic evaluation

 

Tips and Requirements
1. Basic familiarity with the regulations and publications on bridge optimization
2. Introduction to the SAP2000 software
3. Introduction to the theoretical concepts of the linear and nonlinear analysis
4. Basic familiarity with concrete bridges

 

Site's Objectives in Presenting this Project

This project studies the Seismic Evaluation of Bridges Using SAP2000 Software.This project could be helpful for university students, researchers and etc. Also it could be proved useful in scientific and industrial projects, and MSc and PhD theses. In some cases, university students require investigation and research for their MSc and PhD theses. Since the present project consists of a complete project and includes all university flowcharts, it could prove useful.

Write a review

Note: HTML is not translated!
    Bad           Good
Captcha
  • Views: 461
  • Brand: civilhelper
  • Product Code: CV1-1140
  • Availability: In Stock
  • $0.00
  • Ex Tax: $0.00

Tags: Seismic, Evaluation, Bridge, SAP2000, Dynamic