Abaqus,software

Abaqus,software

ABAQUS software is one of the most powerful software in the field of finite element analysis. Due to its widespread elements, ABAQUS has the ability to solve problems from a simple linear analysis to the most complex non-linear modeling. Utilizing this software, you can study various issues such as Heat transfer, Mass transfer, thermal analysis of electrical elements, etc.

Show:
Sort By:

3D Numerical Modeling of Finite Elements of Based Foundations on Reinforced Granular Soil

Introduction In this research, a three-dimensional numerical study on the effect of reinforcement w..

$0.00
Ex Tax: $0.00

Blast Simulation and Investigation of the effects of Blast Shock Wave on Structural Elements

Introduction The shock wave is a discontinuous high-frequency turbulence that moves in the materi..

$0.00
Ex Tax: $0.00

Comparison of the Performance of RBS Connections with Connections Equipped with Slit Steel Dampers

One of the most common events that resulted in the destruction of a structure under seismic loa..

$0.00
Ex Tax: $0.00

Concrete faced rock fill dams’ behavior investigation and modeling (CFRD)

RD benefits and constraints   Benefits  Materials-construction-performance Low..

$0.00
Ex Tax: $0.00

Effect of using FRP fibers in the strength and ductility of reinforced concrete pillars and columns

Damage observed in buildings and bridges during earthquakes over the years shows the need for seismi..

$0.00
Ex Tax: $0.00

Evaluating the effect of faulting on tunnels and underground structures

Landslide is a concern for engineers in civil projects, which includes movement through a soil or st..

$0.00
Ex Tax: $0.00

Evaluating the effect of impedance and layer thickness on the resistance against impact and penetration of layered composite armor

Layered composite armor Multi-layer composite armor is used in anti-bullet vests, tanks, military..

$0.00
Ex Tax: $0.00

Evaluation and seismic reinforcement of roofed Bazaar historic monument

Regarding the fact that the market is the pole of economy and tourism, its maintenance is very ..

$0.00
Ex Tax: $0.00

Evaluation of Different Behavioral Patterns in the Study of Urban Excavation Walls with Reciprocal Support under the Blast Load

ABAQUS software is a very powerful set of modeling applications based on the finite element method (..

$0.00
Ex Tax: $0.00

Finite Element Evaluation of Seismic Vulnerability of Buried Gas Pipes under Reverse Fault Displacement with Passive Defense Approach.

Buried gas pipes are one of the most important lifelines of an advanced society, the disruption of s..

$0.00
Ex Tax: $0.00

Finite Element Modeling of Bolted Connection of End Plate and Its Parametric Study

Considering the financial and life-threatening hazards of severe earthquakes, in addition to the sta..

$0.00
Ex Tax: $0.00

Instantaneous Control of Stress, Strain, and Displacement Applied to Brick wall in 3D modeling

Importance of studying masonry materials structures: Vast applications + high vulnerability in eart..

$0.00
Ex Tax: $0.00

Investigating the Effect of Carbon Fiber Polymer Length on Failure States of Reinforced Concrete Beams

Introduction In recent years, Finite Element Method has been recognized as a powerful instrument ..

$0.00
Ex Tax: $0.00

Investigating the Effect of Concrete Slab in Controlling the Collapse Progression in Structures after Column Elimination

Different parts of this presentation Introduction and general investigation Research history ..

$0.00
Ex Tax: $0.00

Investigation of the Buried Composite Columns Behavior in Concrete under the Explosive Blast Load

Given that the column is a fundamental part of the structure, it is against the explosive blast load..

$0.00
Ex Tax: $0.00
Abaqus, Softwares