Dam

Dam
Preliminary feasibility study of dam construction, risk analysis, design and analysis of arched, weight, and earthly damages for existing dams, advanced drought monitoring services are provided by smart sensors and seismic repairmen of dams, with the help of relevant experts, regulations and relevant guidelines.
 
Show:
Sort By:

Concrete faced rock fill dams’ behavior investigation and modeling (CFRD)

RD benefits and constraints   Benefits  Materials-construction-performance Low..

$0.00
Ex Tax: $0.00

Numerical Study of Landslide in Embankment Dams

The FLAC 3D software is a finite difference software used for engineering simulations. This software..

$0.00
Ex Tax: $0.00
Optimization of Concrete Gravity Dam's Dimensional Design Using Metaheuristic Algorithms New

Optimization of Concrete Gravity Dam's Dimensional Design Using Metaheuristic Algorithms

Introduction The construction purpose of the dam: • Flood control • Supplying water ..

$0.00
Ex Tax: $0.00
Satudy of the Geotextile Effect as a Filter and Drain in Earth Dams New

Satudy of the Geotextile Effect as a Filter and Drain in Earth Dams

Filters and drains consist 5 to 10 percent of the total volume of soil operations.  Replacing G..

$0.00
Ex Tax: $0.00
Dam, Water, hydraulic, structures