Design and Computations

Design and Computations
Subcategory of computing and design provides all engineering services for advanced analysis and design of structures using the most reliable methods and regulations for the design and implementation of structures against all types of loads, including static loads (gravity loads) and dynamic (earthquake, wind, hydrodynamic, etc.).
The purpose of this section is to design secure and reliable structures based on the optimization and economics of structural engineering and minimizing the cost of building constructions.

 
Show:
Sort By:

Investigating the Effect of Carbon Fiber Polymer Length on Failure States of Reinforced Concrete Beams

Introduction In recent years, Finite Element Method has been recognized as a powerful instrument ..

$0.00
Ex Tax: $0.00
Design, Computations, Structure, earthquakes