Design and Computations

Design and Computations
That includes all calculations and design of guard structures, piles, foundations, and geotechnical drilling methods considering the nonlinear behavior of soil capacity, failure criteria, dynamic modeling of soil interaction, the design and evaluation of relevant seismic risks.
Show:
Sort By:

3D Numerical Modeling of Finite Elements of Based Foundations on Reinforced Granular Soil

Introduction In this research, a three-dimensional numerical study on the effect of reinforcement w..

$0.00
Ex Tax: $0.00

Modeling and Probabilistic Analysis of Slope Stability

Today, the use of statistical and probabilistic methods in engineering sciences, especially civil en..

$0.00
Ex Tax: $0.00
Modeling and Probabilistic Analysis of Slope Stability New

Modeling and Probabilistic Analysis of Slope Stability

Today, the use of statistical and probabilistic methods in engineering sciences has been expanded, e..

$0.00
Ex Tax: $0.00

Numerical 3D modeling of finite elements of micro piles under lateral load in sand soil

Piles are used to increase resistance against lateral and upright forces. In many cases horizontal l..

$0.00
Ex Tax: $0.00
Numerical Modeling of the Settlement Distribution and Excavation's Vertical Displacement in Nailing Method New

Numerical Modeling of the Settlement Distribution and Excavation's Vertical Displacement in Nailing Method

Numerical simulation is one of the valuable instruments for increasing the perception of the behavio..

$0.00
Ex Tax: $0.00

Optimization of Nailing System Parameters in deep Excavation by Numerical Modeling

Due to the limitation of the dimensions of the grounds in the city, most excavations are carried out..

$0.00
Ex Tax: $0.00
Design, Computations, Pile،, Foundation،, Retaining, wall, Excavation, Geotechnical