Design of overflows and hydraulic structures

Design of overflows and hydraulic structures
That includes the design of a variety of hydraulic structures including open channels and under different pressure levels, the design of sharp, broad and morning glory spillways, all kinds of ponds and other parts of distribution structures and water transfer through the assessment of natural risks.
Show:
Sort By:

Simulation and analysis of flow liquefaction

 Introduction The presenter behavior model is an elastic-plastic boundary-layer model which is..

$0.00
Ex Tax: $0.00
Design, overflows, hydraulic, structures, Water