Design of water and sewage networks

Design of water and sewage networks
Includes optimal design of water and sewage networks as one of the most important urban arteries, considering the natural hazards (flood, earthquake, landslide, subsidence), and artificially designing a variety of holes and hinges for visits, and monitoring and controlling methods for both periodic and online health.

Your shopping cart is empty!

Design, water, sewage, networks, Water, hydraulic, structures