Flac2&3D

Flac2&3D
The FLAC software, which in English stands for Fast Lagrangian Analysis of Continua, is software for numerical modeling of advanced geotechnical analysis of soil, rock and earth two-dimensional and three-dimensional. It is also used for testing, analysis and designing by mining, geologists and civil engineers.
Show:
Sort By:
Analysis and Examination of the Effect of Overhead on Susceptible Soils to Liquefaction, Modified with Stone Column System under Dynamic Loads New

Analysis and Examination of the Effect of Overhead on Susceptible Soils to Liquefaction, Modified with Stone Column System under Dynamic Loads

The phenomenon of changing the behavior of sand from solid to liquid has been recognized as the firs..

$0.00
Ex Tax: $0.00

Numerical Investigation of Damping Effect of Materials on the Seismic Behavior of the Wall and modeling in Reinforced Soil

Introduction The retaining walls are also as technical buildings, which are widely used in road and..

$0.00
Ex Tax: $0.00
Numerical Modeling and Investigating the Interaction of Twin Tunnels on Each Other New

Numerical Modeling and Investigating the Interaction of Twin Tunnels on Each Other

Introduction The FLAC3D software is one of the products of the Consulting Engineers Group. This sof..

$0.00
Ex Tax: $0.00

Numerical Study of Landslide in Embankment Dams

The FLAC 3D software is a finite difference software used for engineering simulations. This software..

$0.00
Ex Tax: $0.00

The development of FDM for prediction the destruction of the surface structures because of excavation subway stations

 Introduction The prediction of the earth transformation is done based on the 4 methods mentio..

$0.00
Ex Tax: $0.00
Flac2&3D, Softwares