Geotechnical

Geotechnical
The study of soil bed structure, recognition of mechanical, dynamical and chemical characteristics of soil and rock types, assessing seismicity of the earth, recognizing available water resources, engineering geology using geotechnical data from surface, sub-surface exploration, various mechanical tests and the chemical of soil and rock are the major branch of geotechnical engineering.
Also, as the most important structural applications of this branch one can refer to the analysis and design of surface foundations (single, strip, wide) and deep foundations (types of piles) of guard structures and methods for soil corrosion under foundation.

 
Show:
Sort By:

3D Numerical Modeling of Finite Elements of Based Foundations on Reinforced Granular Soil

Introduction In this research, a three-dimensional numerical study on the effect of reinforcement w..

$0.00
Ex Tax: $0.00
Analysis and Examination of the Effect of Overhead on Susceptible Soils to Liquefaction, Modified with Stone Column System under Dynamic Loads New

Analysis and Examination of the Effect of Overhead on Susceptible Soils to Liquefaction, Modified with Stone Column System under Dynamic Loads

The phenomenon of changing the behavior of sand from solid to liquid has been recognized as the firs..

$0.00
Ex Tax: $0.00

Developing a Soil Liquefaction Evaluation Software Using Monte Carlo Numerical Simulation Method

In this research, the probabilistic Monte Carlo simulation method was used to determine the reliabil..

$0.00
Ex Tax: $0.00

Evaluating the effect of faulting on tunnels and underground structures

Landslide is a concern for engineers in civil projects, which includes movement through a soil or st..

$0.00
Ex Tax: $0.00

Evaluation of Different Behavioral Patterns in the Study of Urban Excavation Walls with Reciprocal Support under the Blast Load

ABAQUS software is a very powerful set of modeling applications based on the finite element method (..

$0.00
Ex Tax: $0.00

Evaluation of Torsional Irregularity in Progressive Collapse of Reinforced Concrete Structures

 Introduction Progressive collapse is a chain extension of a partial collapse throughout the s..

$0.00
Ex Tax: $0.00

Finite Element Evaluation of Seismic Vulnerability of Buried Gas Pipes under Reverse Fault Displacement with Passive Defense Approach.

Buried gas pipes are one of the most important lifelines of an advanced society, the disruption of s..

$0.00
Ex Tax: $0.00

Investigation of the Buried Composite Columns Behavior in Concrete under the Explosive Blast Load

Given that the column is a fundamental part of the structure, it is against the explosive blast load..

$0.00
Ex Tax: $0.00

Modeling and Probabilistic Analysis of Slope Stability

Today, the use of statistical and probabilistic methods in engineering sciences, especially civil en..

$0.00
Ex Tax: $0.00
Modeling and Probabilistic Analysis of Slope Stability New

Modeling and Probabilistic Analysis of Slope Stability

Today, the use of statistical and probabilistic methods in engineering sciences has been expanded, e..

$0.00
Ex Tax: $0.00

Modeling the Effect of Blast Load on Buried Pipes on Land and Sea

 Buried structures are always one of the most challenging structures. Among these structures, b..

$0.00
Ex Tax: $0.00

Numerical 3D modeling of finite elements of micro piles under lateral load in sand soil

Piles are used to increase resistance against lateral and upright forces. In many cases horizontal l..

$0.00
Ex Tax: $0.00

Numerical Investigation of Damping Effect of Materials on the Seismic Behavior of the Wall and modeling in Reinforced Soil

Introduction The retaining walls are also as technical buildings, which are widely used in road and..

$0.00
Ex Tax: $0.00
Numerical Modeling and Investigating the Interaction of Twin Tunnels on Each Other New

Numerical Modeling and Investigating the Interaction of Twin Tunnels on Each Other

Introduction The FLAC3D software is one of the products of the Consulting Engineers Group. This sof..

$0.00
Ex Tax: $0.00

Numerical modeling and studying tunnel behavior in layered unsaturated soils under surface blast effect

Villano and charlie (1992) presented experimental correlations for determining particle velocity and..

$0.00
Ex Tax: $0.00
Geotechnical