Geotechnical and earthquake

Geotechnical and earthquake
Seismological assessment of seismic springs, seismicity of faults, shears wave velocity relations in a variety of soils and rock beds, selection of appropriate reduction relations for seismic risk analysis as well as identification of destructive phenomena such as landslide, liquefaction and etc are among the services of this branch.
Show:
Sort By:

Developing a Soil Liquefaction Evaluation Software Using Monte Carlo Numerical Simulation Method

In this research, the probabilistic Monte Carlo simulation method was used to determine the reliabil..

$0.00
Ex Tax: $0.00

Evaluation of Different Behavioral Patterns in the Study of Urban Excavation Walls with Reciprocal Support under the Blast Load

ABAQUS software is a very powerful set of modeling applications based on the finite element method (..

$0.00
Ex Tax: $0.00

Finite Element Evaluation of Seismic Vulnerability of Buried Gas Pipes under Reverse Fault Displacement with Passive Defense Approach.

Buried gas pipes are one of the most important lifelines of an advanced society, the disruption of s..

$0.00
Ex Tax: $0.00

Numerical Investigation of Damping Effect of Materials on the Seismic Behavior of the Wall and modeling in Reinforced Soil

Introduction The retaining walls are also as technical buildings, which are widely used in road and..

$0.00
Ex Tax: $0.00
Geotechnical, earthquake