Improvement and Strengthening

Improvement and Strengthening
In this section, seismic strengthening and improvement services are available (constructed) for vulnerable structures to increase their safety at expected levels thus the latest and most advanced structural and earthquake engineering techniques are fully available. Increasing the capacity of structures and equalizing them with seismic need in the field of strengthening and reducing the seismic demand of structures and the use of modern seismic design technologies, such as the use of separation, dampers, etc., in the area of seismic improvement. It should be noted that the use of all methods of improvement, depending on the need for engineering optimization algorithms, is used to reduce the cost of construction and implementation.
Show:
Sort By:

Comparison of the Performance of RBS Connections with Connections Equipped with Slit Steel Dampers

One of the most common events that resulted in the destruction of a structure under seismic loa..

$0.00
Ex Tax: $0.00

Effect of using FRP fibers in the strength and ductility of reinforced concrete pillars and columns

Damage observed in buildings and bridges during earthquakes over the years shows the need for seismi..

$0.00
Ex Tax: $0.00

Investigating the Effect of Carbon Fiber Polymer Length on Failure States of Reinforced Concrete Beams

Introduction In recent years, Finite Element Method has been recognized as a powerful instrument ..

$0.00
Ex Tax: $0.00
Seismic Evaluation of Bridges Using SAP2000 Software New

Seismic Evaluation of Bridges Using SAP2000 Software

Vulnerability assessment is a very useful method for identifying the weaknesses of bridges that have..

$0.00
Ex Tax: $0.00

Studying aspects of hybrid simulation in analyzing structures with TADAS dampers

 Brid simulation is an economic and trusted method to study seismic behavior of structures agai..

$0.00
Ex Tax: $0.00

Utilization of Perforated Connections in Moment Frames to Improve Seismic Performance

Restoration and Modification of connection Restoration means rehabilitation of stiffness, stre..

$0.00
Ex Tax: $0.00
Improvement, Strengthening, Structure, earthquakes