Matlab

Matlab
Matlab is a software environment for numerical computing and is a programming language. All data in MATLAB is stored in the form of a matrix. Matlab apps are mostly open source and are used in the fields of physics, chemistry, mathematics, electrical engineering, civil engineering and other engineering fields.
Show:
Sort By:

Automation of Structures Equipped with a Damper using Fuzzy Intelligent Algorithm

The use of dampers began in the early 1900's and was used in industry and commerce since the 197..

$0.00
Ex Tax: $0.00

Buckling Analysis of Nano-composite sheets with enforced openings by carbon Nano-tubes

Composite structures are one of the most important and newest concepts in the Nano. Composites have ..

$0.00
Ex Tax: $0.00

Developing a Soil Liquefaction Evaluation Software Using Monte Carlo Numerical Simulation Method

In this research, the probabilistic Monte Carlo simulation method was used to determine the reliabil..

$0.00
Ex Tax: $0.00

Instantaneous Control of Stress, Strain, and Displacement Applied to Brick wall in 3D modeling

Importance of studying masonry materials structures: Vast applications + high vulnerability in eart..

$0.00
Ex Tax: $0.00

Multi-objective optimization using Meta heuristic algorithms

Code capabilities Multi-objective optimization of trusses, object functions, mass and node displace..

$0.00
Ex Tax: $0.00

Optimization of Braced Steel Structures using Ant Colony Optimization Algorithm

Abstract Optimization program of "braced steel structures using ant colony optimization a..

$0.00
Ex Tax: $0.00

Optimized utilization of dam’s reservoir using weed optimization algorithm

Introduction Optimumutilization from reservoirs of dams is one of the most important issues in wate..

$0.00
Ex Tax: $0.00

Performance based on optimization of steel structures considering seismic damage

Performance based on optimization of steel structures considering seismic damage using soft computin..

$0.00
Ex Tax: $0.00

Simulation and analysis of flow liquefaction

 Introduction The presenter behavior model is an elastic-plastic boundary-layer model which is..

$0.00
Ex Tax: $0.00

Studying aspects of hybrid simulation in analyzing structures with TADAS dampers

 Brid simulation is an economic and trusted method to study seismic behavior of structures agai..

$0.00
Ex Tax: $0.00
The probabilistic analysis of the subsidence of surface foundations using spectral stochastic finite element method New

The probabilistic analysis of the subsidence of surface foundations using spectral stochastic finite element method

Given the random nature of the parameters, it is not possible to analyze the problems by using the f..

$0.00
Ex Tax: $0.00
Matlab, Softwares