Opensees

Opensees

OpenSees software is free and open source software which uses finite element method to analyze (static and dynamic) types of structures. OpenSees software has a complete archive of linear and non-linear behaviors concerning the definition of materials, the elements of steel and concrete, and the definition of various elements of modeling.

Show:
Sort By:

Application of OpenSees Open Access Components Software for Structural Performance Evaluation

Research purposes Protecting human lives (life safety) through the prevention of falling vehicles i..

$0.00
Ex Tax: $0.00

Evaluating hybrid connections in bridges

Previously, bridges were designed with focus on resistance and force tolerance against seismic ..

$0.00
Ex Tax: $0.00

Multi-objective optimization using Meta heuristic algorithms

Code capabilities Multi-objective optimization of trusses, object functions, mass and node displace..

$0.00
Ex Tax: $0.00

Optimization of Braced Steel Structures using Ant Colony Optimization Algorithm

Abstract Optimization program of "braced steel structures using ant colony optimization a..

$0.00
Ex Tax: $0.00

Performance based on optimization of steel structures considering seismic damage

Performance based on optimization of steel structures considering seismic damage using soft computin..

$0.00
Ex Tax: $0.00

Studying aspects of hybrid simulation in analyzing structures with TADAS dampers

 Brid simulation is an economic and trusted method to study seismic behavior of structures agai..

$0.00
Ex Tax: $0.00
Opensees, Softwares