Optimization

Optimization

The use of fuzzy algorithms, neural network genetics, Monte Carlo and many of the many applications of this section are essential for design decision making and design of optimal structural sections, dampers, seismic separators, and the provision of optimal methods for reducing structural health sensors.

 Abacus software is one of the most powerful software for finite element analysis. Abacus, due to its very large elements, has the ability of the problem solving from a simple linear analysis to the most complex non-linear modeling. Via using this software, you can study various issues such as heat transfer, mass transfer, thermal analysis of electrical components, etc.

Show:
Sort By:

Multi-objective Optimization based on Meta-heuristics

Optimization problems can be solved by various methods such as classic and meta-heuristics, which ar..

$0.00
Ex Tax: $0.00

Optimization of Braced Steel Structures using Ant Colony Optimization Algorithm

Abstract Optimization program of "braced steel structures using ant colony optimization a..

$0.00
Ex Tax: $0.00
Optimization, and, development, code, civil, engineering