Engineering optimization to reduce time costs, economic development projects by advanced engineering algorithms is a new way of designing and building construction projects. Multivariate decision making for risk assessment and management of construction projects and health monitoring of structures is done by means of optimization methods.
The design of various structures and other constructions by means of optimal selection of sections has led to a significant reduction of economic costs along with maintaining the safety of the constructions.