Plaxis

Plaxis

PLAXIS is limited and advanced element software for analyzing shape change and sustainability used by engineers and consultants in the field of soil and water resources. Usually, in an important geotechnical problem, an advanced behavioral model for modeling nonlinear behavior is needed.

Show:
Sort By:

Numerical modeling and studying tunnel behavior in layered unsaturated soils under surface blast effect

Villano and charlie (1992) presented experimental correlations for determining particle velocity and..

$0.00
Ex Tax: $0.00

Numerical Modeling of Micro Piles Group and Parametric Analysis under Inclined Static Load and Bending Moment in Granular Soils

Micropile Definition Micropiles are the piles with a diameter less than 300 mm. They have light s..

$0.00
Ex Tax: $0.00
Numerical Modeling of the Settlement Distribution and Excavation's Vertical Displacement in Nailing Method New

Numerical Modeling of the Settlement Distribution and Excavation's Vertical Displacement in Nailing Method

Numerical simulation is one of the valuable instruments for increasing the perception of the behavio..

$0.00
Ex Tax: $0.00
Optimization of Drilling Step Length in Multi-stage Tunneling New

Optimization of Drilling Step Length in Multi-stage Tunneling

Introduction The Plaxis 3D Tunnel is a finite-element software that is used for analysis of defor..

$0.00
Ex Tax: $0.00

Optimization of Nailing System Parameters in deep Excavation by Numerical Modeling

Due to the limitation of the dimensions of the grounds in the city, most excavations are carried out..

$0.00
Ex Tax: $0.00
Plaxis, Softwares