Progressive collapse

Progressive collapse
Major safety problems of tall, enormous, high-performance structures, is low reliability of structures in the event of a threat to progressive collapse. Investigation of progressive collapse in these structures requires the study of structural indeterminations and the probability of damage to each member in the event of collapse of other members of the structure during the occurrence of extra loads (earthquakes, fire and impact loads) and studying the nonlinear behavior of structures in the event of a limited collapse and the probabilistic pattern of the collapse progression in the structure. Dynamic and probabilistic analysis of progressive collapse in this area are investigated

Your shopping cart is empty!

Progressive, collapse, Structure, earthquakes