Sap

Sap

SAP (SAP2000) is one of the strongest structural software in civil engineering. It has the ability to analyze static and dynamic (linear and nonlinear) live load analysis for bridges and structures. This software is a result of the efforts of the CSI Structural Engineering and Computer Engineering Group.

Show:
Sort By:

Analyzing height limit of structures with flexural frame system in faults

Near field earthquakes have particular characteristics, which differentiate them from far field eart..

$0.00
Ex Tax: $0.00
Seismic Evaluation of Bridges Using SAP2000 Software New

Seismic Evaluation of Bridges Using SAP2000 Software

Vulnerability assessment is a very useful method for identifying the weaknesses of bridges that have..

$0.00
Ex Tax: $0.00
Sap, Softwares