Softwares

Softwares
Today, with the remarkable progress of hardware and software in computer science, as well as the development of numerical mathematical methods of artificial intelligence, the modeling, analysis and design of machines, types of structures and buildings against the most complex cases of force and boundary conditions with consideration of theories of structural analysis, Strength of Materials, Fracture Mechanics, and other criteria governing the Solid and Fluid Mechanics in the micro and macro range can be performed with great precision. This section introduces some of the most reputable and most famous software and a summary of their features and applications.
Show:
Sort By:

3D Numerical Modeling of Finite Elements of Based Foundations on Reinforced Granular Soil

Introduction In this research, a three-dimensional numerical study on the effect of reinforcement w..

$0.00
Ex Tax: $0.00
Analysis and Examination of the Effect of Overhead on Susceptible Soils to Liquefaction, Modified with Stone Column System under Dynamic Loads New

Analysis and Examination of the Effect of Overhead on Susceptible Soils to Liquefaction, Modified with Stone Column System under Dynamic Loads

The phenomenon of changing the behavior of sand from solid to liquid has been recognized as the firs..

$0.00
Ex Tax: $0.00

Application of OpenSees Open Access Components Software for Structural Performance Evaluation

Research purposes Protecting human lives (life safety) through the prevention of falling vehicles i..

$0.00
Ex Tax: $0.00

Automation of Structures Equipped with a Damper using Fuzzy Intelligent Algorithm

The use of dampers began in the early 1900's and was used in industry and commerce since the 197..

$0.00
Ex Tax: $0.00

Blast Simulation and Investigation of the effects of Blast Shock Wave on Structural Elements

Introduction The shock wave is a discontinuous high-frequency turbulence that moves in the materi..

$0.00
Ex Tax: $0.00

Buckling Analysis of Nano-composite sheets with enforced openings by carbon Nano-tubes

Composite structures are one of the most important and newest concepts in the Nano. Composites have ..

$0.00
Ex Tax: $0.00

Comparison of the Performance of RBS Connections with Connections Equipped with Slit Steel Dampers

One of the most common events that resulted in the destruction of a structure under seismic loa..

$0.00
Ex Tax: $0.00

Concrete faced rock fill dams’ behavior investigation and modeling (CFRD)

RD benefits and constraints   Benefits  Materials-construction-performance Low..

$0.00
Ex Tax: $0.00

Developing a Soil Liquefaction Evaluation Software Using Monte Carlo Numerical Simulation Method

In this research, the probabilistic Monte Carlo simulation method was used to determine the reliabil..

$0.00
Ex Tax: $0.00

Effect of using FRP fibers in the strength and ductility of reinforced concrete pillars and columns

Damage observed in buildings and bridges during earthquakes over the years shows the need for seismi..

$0.00
Ex Tax: $0.00

Evaluating hybrid connections in bridges

Previously, bridges were designed with focus on resistance and force tolerance against seismic ..

$0.00
Ex Tax: $0.00

Evaluating the effect of faulting on tunnels and underground structures

Landslide is a concern for engineers in civil projects, which includes movement through a soil or st..

$0.00
Ex Tax: $0.00

Evaluating the effect of impedance and layer thickness on the resistance against impact and penetration of layered composite armor

Layered composite armor Multi-layer composite armor is used in anti-bullet vests, tanks, military..

$0.00
Ex Tax: $0.00

Evaluation and seismic reinforcement of roofed Bazaar historic monument

Regarding the fact that the market is the pole of economy and tourism, its maintenance is very ..

$0.00
Ex Tax: $0.00

Finite Element Evaluation of Seismic Vulnerability of Buried Gas Pipes under Reverse Fault Displacement with Passive Defense Approach.

Buried gas pipes are one of the most important lifelines of an advanced society, the disruption of s..

$0.00
Ex Tax: $0.00
Softwares