Soil improvement

Soil improvement
Provide scientific and practical solutions for strengthening soil using hard materials and all types of additives in order to reduce the tensions on the soil bed to improve the mechanical and dynamic characteristics of the soil and control the consolidation, compaction of grains and clay soils.
Show:
Sort By:
Analysis and Examination of the Effect of Overhead on Susceptible Soils to Liquefaction, Modified with Stone Column System under Dynamic Loads New

Analysis and Examination of the Effect of Overhead on Susceptible Soils to Liquefaction, Modified with Stone Column System under Dynamic Loads

The phenomenon of changing the behavior of sand from solid to liquid has been recognized as the firs..

$0.00
Ex Tax: $0.00

Numerical Modeling of Finite Elements of Stone columns Reinforced with Geogrid Layers

Soil Improvement and Refinement:  With increasing population growth, the development of indust..

$0.00
Ex Tax: $0.00

Numerical Modeling of Micro Piles Group and Parametric Analysis under Inclined Static Load and Bending Moment in Granular Soils

Micropile Definition Micropiles are the piles with a diameter less than 300 mm. They have light s..

$0.00
Ex Tax: $0.00
Soil, improvement, Geotechnical