Special structures and Critical Infrastructure

Special structures and Critical Infrastructure
Analysis and design of special structures including bridges, industrial structures such as cooling towers, massive chimneys, and many important equipment basics like turbines and generators, design of water and fuel tanks and protective structures of industrial systems are provided by specialists from mechanical, structural, earthquake and electrical fields.
Show:
Sort By:

Evaluating the effect of impedance and layer thickness on the resistance against impact and penetration of layered composite armor

Layered composite armor Multi-layer composite armor is used in anti-bullet vests, tanks, military..

$0.00
Ex Tax: $0.00

Evaluation and seismic reinforcement of roofed Bazaar historic monument

Regarding the fact that the market is the pole of economy and tourism, its maintenance is very ..

$0.00
Ex Tax: $0.00

Evaluation of Different Behavioral Patterns in the Study of Urban Excavation Walls with Reciprocal Support under the Blast Load

ABAQUS software is a very powerful set of modeling applications based on the finite element method (..

$0.00
Ex Tax: $0.00

Fluid gas tanks seismic analysis

Introduction General knowledge on fluid gas Fluid gas introduction Fluid natural gas Fl..

$0.00
Ex Tax: $0.00
Special, structures, Critical, Infrastructure