Structural and soil interaction

Structural and soil interaction
That includes investigating the interaction of soil, structure and non-linear modeling of soil, analysis of the effects of soil vibration on the structure by multi-degree modeling of subsoil soil layers with damping, mass, and hardness to accurately predict the response of important structures and to prevent the escalation of structures.
Show:
Sort By:
Analysis and Examination of the Effect of Overhead on Susceptible Soils to Liquefaction, Modified with Stone Column System under Dynamic Loads New

Analysis and Examination of the Effect of Overhead on Susceptible Soils to Liquefaction, Modified with Stone Column System under Dynamic Loads

The phenomenon of changing the behavior of sand from solid to liquid has been recognized as the firs..

$0.00
Ex Tax: $0.00

Evaluation of Torsional Irregularity in Progressive Collapse of Reinforced Concrete Structures

 Introduction Progressive collapse is a chain extension of a partial collapse throughout the s..

$0.00
Ex Tax: $0.00

Finite Element Evaluation of Seismic Vulnerability of Buried Gas Pipes under Reverse Fault Displacement with Passive Defense Approach.

Buried gas pipes are one of the most important lifelines of an advanced society, the disruption of s..

$0.00
Ex Tax: $0.00
The probabilistic analysis of the subsidence of surface foundations using spectral stochastic finite element method New

The probabilistic analysis of the subsidence of surface foundations using spectral stochastic finite element method

Given the random nature of the parameters, it is not possible to analyze the problems by using the f..

$0.00
Ex Tax: $0.00
Structural, soil, interaction, Geotechnical