Structure and dynamic loads

Structure and dynamic loads

This section is highly specialized using mathematical-numerical-probabilistic methods of signal processing and structural dynamics recognition of dynamic load with special approach to seismic random vibrations and its effects on structures. The dynamic response of structures (one to several degrees of freedom) is calculated and estimated with respect to system specifications including mass, hardness, damping.

Show:
Sort By:

Application of OpenSees Open Access Components Software for Structural Performance Evaluation

Research purposes Protecting human lives (life safety) through the prevention of falling vehicles i..

$0.00
Ex Tax: $0.00

Blast Simulation and Investigation of the effects of Blast Shock Wave on Structural Elements

Introduction The shock wave is a discontinuous high-frequency turbulence that moves in the materi..

$0.00
Ex Tax: $0.00

Evaluating hybrid connections in bridges

Previously, bridges were designed with focus on resistance and force tolerance against seismic ..

$0.00
Ex Tax: $0.00

Evaluation and seismic reinforcement of roofed Bazaar historic monument

Regarding the fact that the market is the pole of economy and tourism, its maintenance is very ..

$0.00
Ex Tax: $0.00

Investigating the Effect of Carbon Fiber Polymer Length on Failure States of Reinforced Concrete Beams

Introduction In recent years, Finite Element Method has been recognized as a powerful instrument ..

$0.00
Ex Tax: $0.00

Investigating the Effect of Concrete Slab in Controlling the Collapse Progression in Structures after Column Elimination

Different parts of this presentation Introduction and general investigation Research history ..

$0.00
Ex Tax: $0.00

Modeling Steps and Analyzing Steel Plate Behavior under the Influence of Underwater Explosion

Project goal Predicting the explosion ship structures behavior under water and shock wave caused by..

$0.00
Ex Tax: $0.00

Performance based on optimization of steel structures considering seismic damage

Performance based on optimization of steel structures considering seismic damage using soft computin..

$0.00
Ex Tax: $0.00

Studying aspects of hybrid simulation in analyzing structures with TADAS dampers

 Brid simulation is an economic and trusted method to study seismic behavior of structures agai..

$0.00
Ex Tax: $0.00

Utilization of Perforated Connections in Moment Frames to Improve Seismic Performance

Restoration and Modification of connection Restoration means rehabilitation of stiffness, stre..

$0.00
Ex Tax: $0.00
Structure, dynamic, loads, earthquakes