Structure and earthquakes

Structure and earthquakes
Structural Engineering, as one of the main branches of civil engineering science, has the task of analyzing, designing and improving all engineering systems, including: Buildings, dams, bridges, life lines, industrial structures and equipment.
Safe design constructions against natural disasters are one of the most important demands of governments and capital owners to protect people's lives, property and to achieve sustainable development.
In seismic countries of the world, earthquake, as one of the potential natural hazards, has always been the cause of death and loss of financial resources. In recent years, there is a high risk of earthquakes except human disasters has led to a lack of financial investment and consequently a decline in the economic growth of seismic communities.
The approach to reduce and manage seismic risk and the reliable design of structures against earthquakes and other natural disasters requires the use of the latest methods of structural and earthquake engineering. This company is a consensus among a number of international experts and by utilizing valid scientific regulations is ready to provide structural and earthquake engineering consulting services in the field of analysis, calculation, design, retrofitting, health monitoring and seismic risk assessment of structures.

 
Show:
Sort By:

Analyzing height limit of structures with flexural frame system in faults

Near field earthquakes have particular characteristics, which differentiate them from far field eart..

$0.00
Ex Tax: $0.00

Application of OpenSees Open Access Components Software for Structural Performance Evaluation

Research purposes Protecting human lives (life safety) through the prevention of falling vehicles i..

$0.00
Ex Tax: $0.00

Automation of Structures Equipped with a Damper using Fuzzy Intelligent Algorithm

The use of dampers began in the early 1900's and was used in industry and commerce since the 197..

$0.00
Ex Tax: $0.00

Blast Simulation and Investigation of the effects of Blast Shock Wave on Structural Elements

Introduction The shock wave is a discontinuous high-frequency turbulence that moves in the materi..

$0.00
Ex Tax: $0.00

Buckling Analysis of Nano-composite sheets with enforced openings by carbon Nano-tubes

Composite structures are one of the most important and newest concepts in the Nano. Composites have ..

$0.00
Ex Tax: $0.00

Comparison of the Performance of RBS Connections with Connections Equipped with Slit Steel Dampers

One of the most common events that resulted in the destruction of a structure under seismic loa..

$0.00
Ex Tax: $0.00

Concrete faced rock fill dams’ behavior investigation and modeling (CFRD)

RD benefits and constraints   Benefits  Materials-construction-performance Low..

$0.00
Ex Tax: $0.00

Evaluating hybrid connections in bridges

Previously, bridges were designed with focus on resistance and force tolerance against seismic ..

$0.00
Ex Tax: $0.00

Evaluating the effect of impedance and layer thickness on the resistance against impact and penetration of layered composite armor

Layered composite armor Multi-layer composite armor is used in anti-bullet vests, tanks, military..

$0.00
Ex Tax: $0.00

Evaluation and seismic reinforcement of roofed Bazaar historic monument

Regarding the fact that the market is the pole of economy and tourism, its maintenance is very ..

$0.00
Ex Tax: $0.00

Evaluation of Different Behavioral Patterns in the Study of Urban Excavation Walls with Reciprocal Support under the Blast Load

ABAQUS software is a very powerful set of modeling applications based on the finite element method (..

$0.00
Ex Tax: $0.00

Evaluation of Torsional Irregularity in Progressive Collapse of Reinforced Concrete Structures

 Introduction Progressive collapse is a chain extension of a partial collapse throughout the s..

$0.00
Ex Tax: $0.00

Finite Element Modeling of Bolted Connection of End Plate and Its Parametric Study

Considering the financial and life-threatening hazards of severe earthquakes, in addition to the sta..

$0.00
Ex Tax: $0.00

Fluid gas tanks seismic analysis

Introduction General knowledge on fluid gas Fluid gas introduction Fluid natural gas Fl..

$0.00
Ex Tax: $0.00

Instantaneous Control of Stress, Strain, and Displacement Applied to Brick wall in 3D modeling

Importance of studying masonry materials structures: Vast applications + high vulnerability in eart..

$0.00
Ex Tax: $0.00
Structure, earthquakes