Tunneling and Buried Structures

Tunneling and Buried Structures
Analysis and design of buried burrows in the soil include tunnels, ducts, and guard structures considering the effect of soil, the assessment of the resistance and bearing capacity of the structure, the effects of earthquakes and other natural hazards
Show:
Sort By:

Evaluating the effect of faulting on tunnels and underground structures

Landslide is a concern for engineers in civil projects, which includes movement through a soil or st..

$0.00
Ex Tax: $0.00

Evaluation of Different Behavioral Patterns in the Study of Urban Excavation Walls with Reciprocal Support under the Blast Load

ABAQUS software is a very powerful set of modeling applications based on the finite element method (..

$0.00
Ex Tax: $0.00

Investigation of the Buried Composite Columns Behavior in Concrete under the Explosive Blast Load

Given that the column is a fundamental part of the structure, it is against the explosive blast load..

$0.00
Ex Tax: $0.00
Numerical Modeling and Investigating the Interaction of Twin Tunnels on Each Other New

Numerical Modeling and Investigating the Interaction of Twin Tunnels on Each Other

Introduction The FLAC3D software is one of the products of the Consulting Engineers Group. This sof..

$0.00
Ex Tax: $0.00

Numerical modeling and studying tunnel behavior in layered unsaturated soils under surface blast effect

Villano and charlie (1992) presented experimental correlations for determining particle velocity and..

$0.00
Ex Tax: $0.00

Numerical Modeling of Finite Elements of Stone columns Reinforced with Geogrid Layers

Soil Improvement and Refinement:  With increasing population growth, the development of indust..

$0.00
Ex Tax: $0.00
Optimization of Drilling Step Length in Multi-stage Tunneling New

Optimization of Drilling Step Length in Multi-stage Tunneling

Introduction The Plaxis 3D Tunnel is a finite-element software that is used for analysis of defor..

$0.00
Ex Tax: $0.00

The development of FDM for prediction the destruction of the surface structures because of excavation subway stations

 Introduction The prediction of the earth transformation is done based on the 4 methods mentio..

$0.00
Ex Tax: $0.00
Tunneling, Buried, Structures, Pipe, Underground, Reservoir, Geotechnical