Vibration Control

Vibration Control
Designing large and important buildings is conducting via using seismic separators, inactive and active dampers to control and response of the structures within the scope of the expected seismic safety objective with the most advanced modeling software and nonlinear analysis of the dynamic services of this section.

Your shopping cart is empty!

Vibration, Control, Structure, earthquakes