Water and hydraulic structures

Water and hydraulic structures

Climate change and drought in recent decades have made the world's most pressing need to manage and optimize the use of water resources by water engineers and hydraulic structures. Hence this field of civil engineering is a necessity for comprehensive development of activities of different sectors of construction, industry, and economics of any country.

The collection, maintenance of water resources and the proper use of them to provide drinking water to the city, the development of needed resources for industry, electricity generation, the development of agricultural resources and etc. is one of the main tasks of this civil engineering branch.

In this company, using the relevant experts and relying on such credible scientific regulations and instructions, engineering services for analyzing and designing blue structures separately, its application in the collection, distribution of water resources as well as the proper management of the water and wastewater sector and designing and modeling of marine structures are completely provided.

Show:
Sort By:

Concrete faced rock fill dams’ behavior investigation and modeling (CFRD)

RD benefits and constraints   Benefits  Materials-construction-performance Low..

$0.00
Ex Tax: $0.00

Numerical Study of Landslide in Embankment Dams

The FLAC 3D software is a finite difference software used for engineering simulations. This software..

$0.00
Ex Tax: $0.00
Optimization of Concrete Gravity Dam's Dimensional Design Using Metaheuristic Algorithms New

Optimization of Concrete Gravity Dam's Dimensional Design Using Metaheuristic Algorithms

Introduction The construction purpose of the dam: • Flood control • Supplying water ..

$0.00
Ex Tax: $0.00

Optimized utilization of dam’s reservoir using weed optimization algorithm

Introduction Optimumutilization from reservoirs of dams is one of the most important issues in wate..

$0.00
Ex Tax: $0.00
Satudy of the Geotextile Effect as a Filter and Drain in Earth Dams New

Satudy of the Geotextile Effect as a Filter and Drain in Earth Dams

Filters and drains consist 5 to 10 percent of the total volume of soil operations.  Replacing G..

$0.00
Ex Tax: $0.00

Simulation and analysis of flow liquefaction

 Introduction The presenter behavior model is an elastic-plastic boundary-layer model which is..

$0.00
Ex Tax: $0.00
Water, hydraulic, structures